Skip to main content
Home Renovation Toronto open-concept kitchen with a white quartz waterfall island and ceiling-height cabinetry
Most Requested

Kitchen Renovation in Toronto: Open Layouts & Custom Cabinets

Home Renovation Toronto has delivered design-build kitchen renovations across the Greater Toronto Area since 1996: open-concept conversions with LVL beam load-bearing wall removal, galley kitchen redesigns, ceiling-height custom cabinetry with Blum soft-close hardware, Caesarstone quartz waterfall countertops and islands, Kohler and Moen undermount sinks, pot lighting and under-cabinet LED, gas line rough-ins by a TSSA-licensed fitter, kitchen peninsula additions, and full appliance package integration. Every kitchen is permitted with the City of Toronto and built on one fixed price locked before demolition begins, with zero allowances.

From a galley refresh at $25,000 to a full open-concept gut renovation at $120,000 installed (2026 pricing), the number you sign is the number you pay.

Whether you're opening a load-bearing wall in an Annex Victorian, replacing galley cabinetry in a Leaside semi-detached, or adding a Caesarstone waterfall island in an Etobicoke split-level, one licensed crew manages design through final walkthrough.

check_circle One-Crew Delivery check_circle Fixed-Price Before Demo check_circle Toronto Permit Specialists

Projects from $25,000 , locked in after pre-construction planning.

★★★★★ 4.9 (150+ Google Reviews)
workspace_premium 28+ Years Experience
task_alt 2,000+ Projects Completed
verified Fixed-Price Guarantee
Designer reviewing a custom cabinetry layout with quartz and oak samples for a North York kitchen renovation

What Does Design-Build Kitchen Remodeling Mean?

Home Renovation Toronto is a licensed and insured design-build contractor that has renovated kitchens in Toronto and across the Greater Toronto Area since 1996, with more than 2,000 projects completed. Design-build kitchen remodeling means one team handles everything - the design, the structural work, the cabinetry, and the finishes - from the first concept sketch to the final clean-up. You are not juggling a separate designer, a cabinet supplier, and a general contractor who each update you once and leave when something goes wrong. There is one plan, one accountable team, and one fixed price.

Our kitchens go beyond swapping out finishes. As a design-build renovation firm, we look at how your kitchen connects to the rest of your home. In Toronto’s older houses - semi-detached homes in Leslieville, detached bungalows in East York, and post-war split-levels in Etobicoke - that usually means a small, closed-off room cut off from the dining and living areas. We open those layouts up, remove load-bearing walls with engineered LVL beams, and build ceiling-height custom cabinetry that captures the storage a stock kitchen wastes.

Every project is quoted at a fixed price after detailed pre-construction planning. We confirm the cabinetry, the countertops, the appliances, and the fixtures before the contract is signed. That means no allowances, no “ballpark” figures, and no mid-project markups when a material runs over.

What’s Included

A full kitchen renovation with us covers the whole job: layout redesign, demolition, structural changes, electrical and plumbing rough-ins, gas line installation, custom cabinetry and millwork, countertops, sinks, lighting, and the final finishing details. We also manage the City of Toronto building permit when one is required.

Cramped, Closed-Off and Dated: Kitchen Problems We Solve

Most Toronto homeowners come to us with the same handful of frustrations. Here is how a proper design-build renovation fixes each one.

A Cramped, Closed-Off Layout

Kitchens in homes built before the 1990s were designed as separate work rooms, walled off from family life. We remove the walls - safely, with engineered beams - and rework the floor plan so the kitchen becomes the open, connected heart of the home.

Not Enough Storage

Stock cabinets stop short of the ceiling and waste the space above. Our custom millwork runs full height, with interior fittings tailored to what you actually store, so a small footprint holds far more. In a condo kitchen with no room to grow, ceiling-height cabinetry is often the single biggest storage gain available.

Budget Uncertainty

A renovation quoted with “allowances” almost always climbs. We specify every material during pre-construction and lock the price, so your kitchen budget is settled before the first cabinet is removed.

An Awkward Work Triangle

A kitchen can look fine and still function poorly. Our in-house designers plan the relationship between the sink, range, refrigerator, and prep space around how you cook, then show it to you in 3D before anything is built.

Why Planning Happens Before the Price Is Locked

The most expensive decision in any kitchen project is made before construction starts: the design. That is why the Home Renovation Toronto design team invests heavily in pre-construction planning. You see your new kitchen in 3D renderings, adjust the layout and finishes while changes still cost nothing, and approve a complete finish schedule. Only then do we lock in the fixed price and reserve your crew.

Many clients pair the kitchen with a bathroom renovation in the same contract. Planning both rooms on one finish schedule lets the bathroom vanity, the kitchen cabinetry, and the countertops share materials and hardware, and it puts both rooms through a single permit and inspection sequence.

The result is a kitchen renovation with no guesswork - a clear plan, a guaranteed budget, and one team accountable for every detail.

How Much Does a Kitchen Renovation Cost in Toronto?

In 2026, most full kitchen renovations in Toronto range from $25,000 to $80,000 depending on scope, finishes, and whether structural changes are involved. Projects with Caesarstone quartz countertops, ceiling-height custom cabinetry, or open-concept wall removal run toward the higher end. A professional-grade kitchen that adds a gas cooktop also requires gas line installation, typically $1,000 to $2,000 depending on line length and placement.

Renovation LevelTypical CostDurationWhat’s Included
Budget$25K - $40K3 - 5 weeksStock cabinets, laminate counters, basic fixtures
Mid-Range$45K - $75K5 - 7 weeksQuartz countertops, custom cabinetry, tile backsplash
Premium$80K - $120K+6 - 10 weeksCaesarstone, ceiling-height cabinets, open-concept layout

Cabinetry accounts for 30 to 40% of total project cost. Custom cabinetry - built to your kitchen’s exact dimensions with soft-close Blum or Hettich hardware, dovetail drawers, and integrated lighting - costs more than stock but fits properly, lasts longer, and eliminates the filler strips and wasted corners that stock boxes leave behind. Our trade-direct sourcing removes retail markup on Caesarstone surfaces, Kohler fixtures, and custom millwork.

Condo kitchens in downtown towers and North York high-rises follow different cost drivers: condo board approval, elevator bookings, restricted working hours, and plumbing stacks that cannot move. Our condo renovation team handles board paperwork and building rules as part of the same fixed-price contract.

How Long Does a Kitchen Remodel Take?

A typical Toronto kitchen renovation runs 6 to 10 weeks from demolition to completion, plus 2 to 4 weeks upfront for design finalization and permit approval. Permit approval from the City of Toronto Building Division can add 1 to 3 weeks for structural or gas line work - we file and manage the full permit set so you don’t track a single form.

PhaseDurationKey Activities
Design and Permits2 - 4 weeksFinal plans, permit submission, material orders
Demolition3 - 5 daysSite protection, tear-out, waste removal
Rough-Ins1 - 2 weeksElectrical, plumbing, gas lines
Cabinetry and Countertops2 - 3 weeksCustom cabinetry, Caesarstone templating and install
Finishing1 - 2 weeksFlooring, backsplash, paint, fixtures, final clean

For homes in older Toronto neighbourhoods - East York bungalows, Etobicoke split-levels, pre-war semis in Leslieville and Riverdale - demolition often uncovers galvanized plumbing, knob-and-tube wiring, or undersized electrical panels. Our pre-construction walkthrough documents every room before demo starts, so nothing found during tear-out becomes a mid-project change order.

Cabinet Refacing or a Full Gut: Which Fits Your Kitchen?

Cabinet refacing replaces doors and hardware while keeping the existing box structure in place. It costs 40 to 60% less than a full renovation and finishes in about a week - the right call when the cabinet boxes are structurally sound and the layout works.

A full renovation is the right call when you want layout changes, new plumbing or electrical rough-ins, an open-concept wall removed, or upgraded countertops like Caesarstone quartz. Refacing cannot reposition the sink, add a dishwasher circuit, or fix an awkward work triangle. If you are adding a gas range or moving the island, a full renovation is the only path that gets there with permits closed and work done to code.

City of Toronto Permits, ESA and TSSA Inspections

Toronto requires a building permit for any structural change, new plumbing, or gas line installation. Projects touching electrical must be inspected by the Electrical Safety Authority. We manage every permit - building, mechanical, and ESA - and do not hand off a finished kitchen until every inspection is closed.

Lighting upgrades follow a layered plan: recessed pot lights for ambient coverage, under-cabinet LED strips for task lighting at the counter, and pendants over the island for accent and visual weight. Older homes often need a panel upgrade from 60-amp or 100-amp to 200-amp service before these circuits can be added safely. Range hoods are vented externally whenever duct access allows - recirculating hoods do not meet Toronto’s ventilation performance requirements for new installations.

Quartz Countertops, Custom Cabinetry and Fixtures

Countertop choice sets the tone for both the look and durability of a finished kitchen. Most Toronto homeowners renovating in 2026 choose quartz countertops for their stain resistance and low maintenance. Caesarstone remains the most specified brand on mid-range and premium projects - the Empira White, Statuario Maximus, and Raw Concrete collections handle high-use surfaces without sealing. For clients wanting natural stone, we source granite slabs through trade suppliers at direct pricing. Porcelain slab is growing in popularity for waterfall islands and full-height backsplashes because it tolerates heat and heavy use without resealing.

Cabinetry is where budget decisions matter most. Custom cabinetry is built to the millimetre against your kitchen dimensions - no filler strips, no wasted corner space. Interior fittings include pull-out organizers, spice drawers, and waste sorting built into the cabinet footprint rather than added as afterthoughts. Ceiling-height upper cabinets with integrated LED strips underneath are standard on our mid-range and premium projects. For clients who want the look without full custom pricing, we offer semi-custom solid-wood doors on a pre-built box, which delivers 80% of the visual result at a lower cost.

Sink and faucet selection happens during pre-construction, not mid-build. Undermount sinks in stainless steel or granite composite are most requested - they create a clean counter-to-basin transition that wipes down in one pass. Kohler and Delta faucets are specified most often for their compatibility with quartz countertops, their lifetime warranties, and the fact that every Toronto plumbing supplier stocks their cartridge repair parts.

Not Ready for a Full Gut? Your Partial Update Options

Not every kitchen needs a full gut renovation. Here is how we help clients decide:

Full renovation is the right call when: the layout does not work, the plumbing needs relocation, you want an open-concept wall removed, the electrical panel is undersized, or the cabinetry is structurally compromised. Full renovations require a building permit and typically take 6 to 10 weeks once permits are in hand.

Cabinet refacing makes sense when: the layout functions well, the cabinet boxes are square and solid, and the goal is a cosmetic refresh. Refacing finishes in 5 to 7 days and costs 40 to 60% less than a full renovation. It cannot move the sink, add circuits, or fix an awkward work triangle.

Appliance-only swap is sometimes the right move when the kitchen is less than 10 years old and the layout works. New appliances paired with a fresh backsplash and hardware swap can refresh the space without a permit or extended timeline.

Plumbing Upgrades in Older Toronto Homes

Kitchen renovations in homes built before 1970 routinely encounter plumbing conditions that need correction before new fixtures go in. The most common issues are galvanized steel supply lines, which corrode internally over time and restrict flow, and original brass shutoff valves under the sink and at the dishwasher connection that no longer seal reliably.

Our standard approach on older homes is to replace supply lines to the sink, dishwasher, and refrigerator ice-maker in copper or PEX during the rough-in phase. PEX is the preferred material for new runs inside wall cavities - it handles freeze-thaw cycles, requires fewer fittings than copper, and is approved under the Ontario Building Code for residential potable water supply. Every shutoff valve gets replaced with a quarter-turn ball valve so future fixture swaps can be done without shutting off the whole house.

Gas line work for range installations is handled by our TSSA-licensed gas fitter. Toronto does not allow homeowners to connect or extend gas lines, and the inspection process requires a TSSA-certified technician to sign off before the building permit can be closed. If your project includes a gas range or gas cooktop, we schedule the TSSA inspection as part of the permit close-out sequence so there are no hold-ups on final occupancy.

Range Hoods and Ventilation That Meet Ontario Code

Proper ventilation is one of the most skipped items on kitchen renovation checklists and one of the most consequential for long-term air quality and surface durability. Cooking produces moisture, grease particulates, and combustion byproducts that, without effective extraction, accumulate inside cabinet interiors and accelerate finish degradation - particularly on quartz surfaces near the range, where repeated steam exposure can compromise the resin bonding in lower-quality slabs.

The Ontario Building Code requires that range hoods serving gas ranges vent externally. For electric ranges, recirculating hoods with carbon filters are code-compliant but perform significantly below external-vent configurations. Where duct access to an exterior wall or roof penetration is available, we always recommend external venting.

Hood sizing follows a standard rule: the hood should be 6 inches wider than the cooking surface on each side, and CFM rating should be a minimum of 100 CFM per linear foot of cooking surface. For a 36-inch range, that means a minimum 600 CFM hood rated for external discharge. Zephyr, Faber, and Broan are the three brands most commonly specified on our projects across the budget, mid-range, and premium tiers respectively.

Duct insulation is required where the exhaust duct passes through an unconditioned space - typically the attic on upper-floor kitchens or exterior wall cavities in ground-floor kitchens with side-wall discharge. Without insulation, temperature differentials cause condensation inside the duct that drips back toward the hood and promotes mould growth at the duct collar.

Lighting Design: Task, Ambient, and Accent Layers

A well-lit kitchen runs on three independent lighting circuits that can be dimmed and adjusted independently of each other.

Task lighting is the functional layer - the light you cook under. Recessed LED pot lights positioned over the prep counter, island, and range provide shadow-free coverage at the work surface. Under-cabinet LED strip lights are the second task-layer element: installed inside the upper cabinet base, they illuminate the counter directly below without creating glare from the room’s ambient sources. We use Philips Hue or Lutron Caséta dimmable LED strips on projects where clients want smart-home integration.

Ambient lighting sets the room’s base illumination level. For open-concept kitchens that flow into a dining or living area, ambient fixtures need to bridge the transition without creating a hard visual boundary between zones. Flush-mount or semi-flush LED fixtures on a separate dimmer circuit allow the kitchen’s background light level to match the adjoining room’s mood without cooking task areas going dark.

Accent lighting is the finishing layer - the component that makes a kitchen photograph well and feel considered. Interior LED lighting inside glass-front upper cabinets, LED strips in open shelving recesses, and pendant fixtures over the island all contribute to the accent layer. Pendants over the island serve both functional and aesthetic purposes: they provide focused light on the island surface while visually anchoring the island as a defined zone within the larger open-plan space.

All three circuits are wired to smart dimmers on our mid-range and premium projects. Single-gang Lutron dimmers are the most reliable option for LED compatibility - they eliminate the flicker and hum that budget dimmers produce with LED loads.

How Our Fixed-Price Kitchens Compare

FeatureTypical ProviderHome Renovation Toronto
Pricing modelEstimate with allowances for cabinets, counters, and fixturesFixed price locked before demolition, zero allowances
DesignSeparate designer or cabinet showroom layoutIn-house design team with 3D renderings and a full finish schedule
Permits and inspectionsHomeowner pulls permits or work proceeds unpermittedCity of Toronto building permit, ESA, and TSSA inspections handled in-house
SchedulingCrew shared across several jobsBooked 3 to 4 months ahead with one dedicated crew
Warranty responseNo set response time2-business-day response on all warranty claims
Track recordVariesSince 1996, 2,000+ projects completed

Kitchen Renovations Across the Greater Toronto Area

Our crews complete kitchen renovations across Toronto and the surrounding municipalities, including North York, Etobicoke, Scarborough, East York, Mississauga, Brampton, Vaughan, Markham, Richmond Hill, and Oakville. In York Region we also renovate kitchens in Thornhill, Maple, and Aurora. Our pre-construction site visit covers every renovation regardless of location - no travel fees within the GTA.

Permit requirements and inspection timelines vary slightly by municipality. Toronto Building Division is the authority having jurisdiction within the City of Toronto boundaries. Projects in Mississauga, Brampton, Vaughan, Markham, Richmond Hill, and Oakville fall under their respective municipal building departments. We manage permit applications in all jurisdictions and coordinate inspections directly with the relevant authority.

Searching for a kitchen contractor near you? Call (647) 699-8006 or contact us to schedule a free pre-construction consultation and receive a fixed-price quote before any work begins.

Transparent Pricing

How Much Does Kitchen Renovations Cost?

Kitchen Renovations projects with our team start from the figure below. The exact number depends on scope and finishes. Once pre-construction planning is complete, that figure becomes a firm fixed price with zero allowances.

$25,000 starting price

Galley refreshes from $25,000; most full design-build kitchens land between $45,000 and $75,000. Final fixed price confirmed after pre-construction planning.

Get Your Fixed-Price Quote
Why Choose Us

Why Toronto Homeowners Trust Us With Their Kitchens

architecture

In-House Design Team

Your kitchen is planned by the same firm that builds it, so the design you approve is the kitchen you get.

verified

True Fixed Pricing

Every cabinet, counter, and fixture is specified before the price is locked - zero allowances, zero creep.

shelves

Custom Cabinetry

We build ceiling-height, soft-close cabinetry that maximizes storage in Toronto's older homes.

foundation

Structural Expertise

Removing a load-bearing wall is routine for us - engineered LVL beams open up the layout safely.

Our Process

How Our Kitchens Process Works

design_services 01

Design & Plan

Our in-house team creates your kitchen layout, 3D renderings, and a full finish schedule before any price is locked.

request_quote 02

Fixed-Price Quote

We confirm every material and detail, then lock in one guaranteed price - no allowances, no surprises.

construction 03

Build

One dedicated crew handles demolition, structural work, cabinetry, and finishes on a reserved schedule.

task_alt 04

Final Walkthrough

We complete a detailed walkthrough, hand over your warranty, and clean up so the kitchen is ready to use.

Ready for a fixed price on your kitchens project?

Book a free consultation. We plan every detail, then lock the price. No allowances, no surprises.

Our Work
The Transformation

See the Difference

Kitchens before renovation Before
Kitchens after renovation After
Real Toronto Homeowners

What Clients Say About Our Kitchens

★★★★★
4.9 from 150+ Google reviews
★★★★★
“We opened up the wall between the kitchen and dining room and installed a Caesarstone waterfall island with seating for four. They gave us a fixed price before we signed, and that was exactly what we paid. No allowances, no surprise change orders. Our whole main floor was opened up on schedule.”
D
Daniel R.
Vaughan
★★★★★
“Our kitchen had a 1990s layout with a peninsula that blocked the light. The 3D renderings let us adjust the new open layout and ceiling-height cabinet design before anything was built. The Blum soft-close hardware and integrated LED strips under the uppers were exactly what we had on the render.”
A
Andrew K.
Etobicoke
★★★★★
“We swapped a gas line to the old range location and moved the island. They brought in a TSSA-licensed gas fitter and handled the ESA permit for the new circuits. Fixed price included all of it. The Caesarstone countertop was templated and installed without a single seam.”
S
Stephanie M.
Mississauga
Got Questions?

Kitchens Renovation FAQs

How much does a kitchen renovation cost in Toronto? expand_more
In 2026, kitchen renovations in Toronto run from about $25,000 for a galley refresh with stock cabinets to $45,000 to $75,000 for a mid-range kitchen with quartz countertops and custom cabinetry. Premium open-concept projects with load-bearing wall removal and ceiling-height millwork run $80,000 to $120,000 or more. We confirm every material during pre-construction planning and then lock one fixed price with no allowances, so the number you approve is the number you pay.
Can you renovate a kitchen for $10,000? expand_more
A $10,000 budget in Toronto typically covers a cosmetic refresh rather than a new kitchen: painted or refaced cabinet doors, new hardware, a tile backsplash, and possibly an appliance swap in a small condo kitchen. It does not cover new cabinetry, countertops, plumbing changes, or permits. Our full kitchen renovations start at $25,000 for a galley refresh with new stock cabinets and fixtures.
How long does a kitchen renovation take? expand_more
A full kitchen renovation takes 6 to 10 weeks on site from demolition to completion, plus 2 to 4 weeks beforehand for design finalization and City of Toronto permit approval. Budget kitchens with stock cabinets finish in 3 to 5 weeks, while open-concept projects with structural work sit at the longer end. Because we book projects 3 to 4 months in advance, one dedicated crew is reserved for the entire build.
Can a closed-off kitchen be opened into an open-concept layout? expand_more
Yes. Most kitchens in Toronto homes built before the 1990s can be opened to the dining or living room. A structural engineer sizes an engineered LVL beam to carry the load of the removed wall, a City of Toronto building permit is issued, and the ceiling is patched and finished. Opening closed kitchens into open-concept living is one of our most common projects.
Is custom cabinetry worth it for a kitchen renovation? expand_more
Custom cabinetry is built to your kitchen's exact dimensions, so it runs to the ceiling and uses corner space that stock boxes waste. Cabinetry makes up 30 to 40% of a kitchen budget, and our custom work includes Blum soft-close hardware, dovetail drawers, and interior fittings like pull-out organizers as standard. For tighter budgets, semi-custom solid-wood doors on a pre-built box deliver most of the look at a lower cost.
Can we stay in our home during a kitchen renovation? expand_more
Many homeowners stay during a single-room kitchen renovation. We plan a temporary kitchen setup with you during pre-construction and seal off the work area to keep dust contained. For larger projects that combine the kitchen with whole-home work, we discuss living arrangements before construction begins.
What is included in a fixed-price kitchen renovation? expand_more
Our fixed price covers design, permits where required, demolition, structural work, electrical and plumbing rough-ins, gas line work, cabinetry, countertops, sinks, fixtures, lighting, finishes, and final clean-up. Every material, brand, and grade is specified before the contract is signed, so there are no allowances and no mid-project markups.
Do you need a permit to renovate a kitchen in Toronto? expand_more
A cosmetic kitchen update with no layout change does not need a permit. If the renovation removes or alters a load-bearing wall, moves plumbing, or adds a gas line, the City of Toronto requires a building permit, and new electrical circuits need an Electrical Safety Authority (ESA) inspection. We prepare the drawings, submit the applications, and coordinate every inspection as part of our turnkey service.
What warranty comes with a kitchen renovation? expand_more
As a licensed and insured general contractor, we respond to every post-renovation warranty claim within 2 business days. Fixtures carry their own manufacturer coverage on top of our workmanship warranty, including lifetime warranties on Kohler and Delta faucets.
How far in advance should I book a kitchen renovation? expand_more
We book projects 3 to 4 months in advance. Early booking allows time for design finalization, custom cabinetry lead times of 8 to 12 weeks, and permit approval before your construction start date.
Can you remove a load-bearing wall to open the kitchen to the dining room? expand_more
Yes. Load-bearing wall removal requires a structural engineer's report and a building permit. We coordinate the engineer, prepare the drawings, and manage the permit. LVL beams sized to the span replace the wall, and the ceiling is patched and finished as part of the scope.
What is the difference between a fixed-price contract and an allowance-based quote? expand_more
An allowance-based quote uses placeholder figures for materials like tile, cabinetry, or fixtures that will be selected and priced later. Those allowances almost always come in over the estimate. A fixed-price contract specifies every material, brand, and grade before signing - the number you approve is the number you pay, with no mid-project adjustments to your total.
What are realistic cost ranges for a condo kitchen versus a standard 10x10 kitchen in Toronto, and how does labour break down? expand_more
Smaller condo kitchens in Toronto typically start around $10,000 to $20,000 for light refreshes and run $25,000 to $45,000 for mid-range renovations. A full 10x10 custom kitchen with cabinetry, Caesarstone countertops, lighting, plumbing, and flooring can reach $60,000 or more depending on materials and finishes. Labour typically accounts for 40 to 50% of the total cost. Our fixed-price structure locks all labour and material costs before demolition begins.
How do custom cabinetry and ceiling-height cabinets compare to IKEA-style kitchens on price, lead time, and durability? expand_more
Custom cabinetry provides precise fit for your kitchen's exact dimensions, full ceiling-height storage, and premium features including soft-close Blum hardware, dovetail drawers, and moisture-resistant interiors. Lead times average 8 to 12 weeks but the result is stronger construction and better longevity. IKEA-style modular kitchens install faster and cost less upfront but rarely match the fit and finish of custom work - filler strips, exposed cabinet ends, and limited interior fittings are common compromises. Caesarstone and other quartz countertops pair best with custom millwork for a continuous, professional appearance without alignment issues.
Projects book 3–4 months ahead

Ready to Start Your Kitchens Project?

Book a free consultation and get a firm, fixed-price quote for your kitchen renovations.

check_circle Fixed-price guarantee check_circle Licensed & insured check_circle One accountable team
call